Putting One Together Actually Works If You Read the Thing First
I picked up a Leaf pergola kit last year. Came in four boxes, roughly three hundred pounds of powder-coated aluminum, and a manual that was clearly designed by someone who has never actually held a hex key. I've assembled maybe a dozen of these over the years. They're not hard. They're just... fussy in predictable ways. Here's how to actually get it done without swearing at a mounting bracket at 10pm on a Tuesday. The manual breaks down into phases: site prep, base plate layout, post installation, beam lacing, slat attachment, and finally the trim work nobody looks at until the end. I always do the trim first as a dry fit before I bolt anything down to the ground. It takes thirty seconds and saves you from discovering you're missing a screw after the structure is already standing and you can't reach the joint anymore. Phase one is site work. You need a level, square area. That's it. If your ground is concrete, you're using wedge anchors. If it's wood decking, you're using lag shields or through-bolts through the joists. Find the joists with a stud finder that doesn't cost sixty dollars. The cheap ones will lie to you.
I once spent an hour trying to square a pergola on a composite deck because I didn't account for the fact that my deck boards weren't parallel. The structure looked fine from the street and completely wonky from the patio. Solution was measuring diagonals instead of trusting the perimeter. If both diagonal measurements are equal, it's square. Always use that test, not a tape measure along two sides.
Base Plates and Post Installation
Mark your base plate positions on the surface. Don't drill yet. Set the plates and check spacing. The distance between posts determines which beam section you're using, and if you're off by even an inch, the pre-drilled holes won't line up and you'll be wrestling with alignment pins like you're trying to thread a needle while wearing oven mitts. Anchor the base plates but don't torque them fully yet. Leave them finger-tight so you can make micro-adjustments once the posts are vertical. Use a real torpedo level, not the one on your phone. Phone levels are fine for checking if a shelf is roughly straight, not for engineering a structural assembly. Slide the posts into the base plates. There's usually a gendered connection—male tenon into female socket, or a flange bolt pattern. My kit used flange bolts with captive washers that were supposed to stay attached to the bolt head. Half of mine fell into the grass immediately. I used a magnetic pickup tool. If you don't have one, put a little tape over the bolt head inside the socket before you start. It keeps the hardware from disappearing into the earth.
Get the Full Details

Once all four posts are seated, plumb them. Adjust the base plate positions slightly if needed. Then go back and torque the anchors. This is where the diagonal measurement comes in again. Re-check it. If it shifted during plumbing, nudge it back.
Beam Lacing and Lattice Work
The beams interlock in a grid pattern. They slot into the post caps with a simple lap joint. No welds, no special tools. You need someone to hold one end while you slide the other into place, unless you have a third hand or a couple of C-clamps to temporarily hold sections while you work. The cross beams go in perpendicular to the main beams, creating the lattice roof structure. Each beam has a pre-cut notch so they sit flush against each other. Here's the thing the manual doesn't emphasize enough: clean out the debris from those notches before assembly. Shipping leaves sawdust and metal shavings in every joint. If you skip this, your beams sit unevenly and you'll have wobble in the roof that you'll only notice after you've installed every single slat. I used compressed air for this. Took about two minutes and made the entire assembly significantly easier. Worth every second.
Attachment of Slats and Final Trim
The slats are the louvers that form the roof surface. They clip or screw into the lattice frame depending on your specific model. Some Leaf models use a hidden clip system that snaps into the beam edge. Others use visible screws with color-matched caps. Read your manual's section on this carefully because getting it wrong means you'll be removing finished slats to redo a row. Start from one corner and work outward. Don't start from the middle and try to meet in the middle—that's how you end up with a half-inch gap at the last slat and nothing you do fixes it. Leave the final slat loose until all others are in place, then trim or adjust as needed. The trim pieces go on last. They cover the raw edges and give it a finished look. This is also your chance to catch any issues before you seal everything down. Walk around the structure, check every joint, make sure nothing is rocking or misaligned.

Common Problems and What to Do About Them
Threaded holes in the aluminum can strip if you overtighten. Use a torque-limiting driver or just stop when you feel resistance. Aluminum threads are softer than steel inserts and they don't forgive. If a hole does strip, you can sometimes salvage it with a slightly larger screw and a dab of threadlocker, or replace the component—most manufacturers sell individual parts. Another issue I ran into was warped packaging. One of my side beams had a slight bow from sitting flat under weight in the box. It wasn't defective, just stressed. I could have returned it, but I also could just install it and the slat attachment pulled it straight once everything was torqued down. Don't panic at a minor warp. Check if the structure squares out after assembly before assuming anything is wrong. If you're building on an existing deck, check the deck's load rating. A pergola adds point loads at the post locations, especially in wind. A properly built pergola on a structurally sound deck is fine. A pergola on a sagging or undersized deck is a liability. If your deck is more than fifteen years old and you haven't inspected the joists, do that before bolting anything down.
One last thing: keep all the hardware organized. Sort screws by type and size into small containers. I use disposable ice cube trays for this. They're cheap, clear, and you can see exactly what's in each compartment. At the end of the project you'll have leftover hardware, which is normal, but you want to know which tray each screw came from in case you need to touch something up later.