A Practical Guide to Managing Power at Power Pamplona Events
I spent three summers helping coordinate electrical logistics for the San Fermín festival runs in Pamplona. What follows is a guide that covers what Power Pamplona refers to in practical terms — the temporary power distribution and management system used during the festival week and other large events in the city — and how to approach it if you're ever responsible for setting up generators, panels, or loads in that environment. Power Pamplona isn't a single piece of equipment. It's the collective term most electricians and event technicians use on the ground to describe the temporary high-voltage and low-voltage distribution network that the city's utilities department, Iberdrola, and local contractors set up along the route and in the festival zones every year. The system pulls from the municipal grid where possible and supplements with diesel generators for areas where permanent infrastructure can't handle the load. Here's the part most people get wrong. The festival draws roughly 2 to 3 megawatts across the entire route and adjacent plazas during peak hours. That sounds like a lot until you realize about forty percent of that load comes from temporary lighting rigs, PA systems, and medical station equipment that all turn on simultaneously right before the encierro starts at eight in the morning. If your distribution plan doesn't account for that inrush current, you're going to trip main breakers and lose power to half your setup before the bulls even hit the calle Estafeta.
How to Set Up a Power Pamplona Distribution Plan
Start by getting the official load schedule from the event organizer or the city's technical department. They'll provide a document listing every sanctioned point of use along the route, their expected wattage, and whether each point is on a dedicated circuit or shared. I've seen too many people skip this step and assume they can figure it out on-site. You can't. The city won't energize anything without a signed single-line diagram, and without that diagram you're just running extension cords blind. Once you have the schedule, build your distribution in stages. Here's the order that actually works in practice: first, establish your main incoming feed from the generator or grid tie point. Use 70 millimeter quadrax cable for anything over fifty kilovolts-amperes. Don't cheap out on the cable — I've seen 35 millimeter cable melt at the terminations during a July afternoon when the ambient temperature pushed the ampacity past its rating. The cable itself was fine. The lugs weren't torqued properly and the contact resistance turned the connection into a heater. From the main feed, branch into sub-distribution panels. Use IP65-rated enclosures. The dust and debris on the calle Estafeta during the run will get into everything, and a tripped breaker because of dust contamination is a real problem. I had one incident where a seemingly minor dust buildup in a distribution panel caused a phase-to-ground fault that took forty-five minutes to diagnose because the fault wasn't consistent. It only happened when the panel warmed up from ambient load. Seal everything properly from the start.
Dealing with the Inrush Problem During Peak Load
This is where most setups fail. The moment the encierro starts, you've got fluorescent and LED lighting ballasts, audio amplifiers, and medical refrigeration units all demanding maximum current at once. The smart workaround is staggering the energization. Don't throw all the main breakers simultaneously. Bring up your critical loads first — medical stations, communications, safety lighting. Then add audio and broadcast. Then add the decorative and perimeter lighting last. This sequence reduces the initial surge by roughly sixty percent compared to simultaneous energization. I learned this the hard way during my second year on the job. We had a generator rated at one hundred and twenty-five kilovolts-amperes and we simultaneously energized everything on the schedule. The generator control module saw the step load and shut down the unit to protect the engine. We lost power for about twelve minutes while we rebooted and restarted in sequence. The city inspector was not happy. We never made that mistake again.
Get the Full Details

Grounding and Safety Considerations Specific to Power Pamplona Sites
Pamplona's older infrastructure means that some festival zones sit on historic stone or compacted earth with variable conductivity. Your ground electrode system needs to account for this. Drive at least two ground rods at least two meters apart and measure the ground resistance between them. If you're above five ohms, add more rods or use an earth enhancement compound. I've seen setups in the Plaza del Ayuntamiento area where the ground resistance was above twelve ohms because the technicians didn't test until after the equipment was already connected. That's a shock hazard and a equipment-damage risk that you don't want to discover during an event. Also, bond all metallic enclosures and conduit runs together. The temporary nature of the setup means you'll have multiple metal panels sitting near each other, and if they're not bonded, you can develop potential differences between them that will arc if someone touches both at once. It's a rare but documented injury mechanism at outdoor festivals.
What Power Pamplona Doesn't Cover and What You Should Plan For Instead
The temporary distribution system won't protect you from weather, unauthorized modifications by other vendors, or grid instability from the city side. I've seen rain get into a junction box because the cover wasn't seated correctly and cause a three-phase fault that killed power to the entire medical station for twenty minutes. Use dielectric grease on all connectors. Use weather boots on every outdoor connection point. And always have a portable spare generator on standby, sized at least twenty-five percent of your largest single load, ready to pick up critical circuits if the main supply fails. There's also the issue of noise restrictions. Pamplona has strict decibel limits after midnight in residential zones adjacent to festival areas. Your generator exhaust and cooling fans can push you over those limits if you site them improperly. I've had to relocate a generator three times in one night because neighbors complained. Put them downwind from sensitive areas and use acoustic blankets around the unit. It adds maybe ten minutes to setup but saves you from a complaint-driven shutdown that the police can enforce.
Downloadable Resources and Reference Material
The City of Pamplona's technical department publishes an annual guide called the Guía Técnica de Montajes Eléctricos para Festivales that covers all the requirements for temporary power installations during San Fermín and other events. It's available in Spanish on their website under the eventos y festivales section. There isn't an English version. If you're not comfortable reading the technical Spanish, bring someone who can translate the electrical diagrams before you start work. Misreading a voltage rating from a spec sheet because of a language barrier has caused more equipment damage than I care to count. Iberdrola also maintains a contact desk for event technicians that can provide confirmations on grid capacity for your specific zone. Call them at least two weeks before your event. The confirmation process takes longer during festival season because they're processing requests for the entire San Fermín schedule at once.

Final Notes on Working With Power Pamplona Systems
The system works well when you respect the planning requirements and don't try to improvise on-site. The most common failure mode I've observed is people treating the temporary distribution like a permanent installation — skipping ground resistance tests, leaving connections exposed, and not having a documented load schedule. None of those are defensible if something goes wrong. Keep your documentation current, test your grounds before you connect load, and stagger your energization sequence. Those three habits will keep your setup running through the entire event without a major incident.